Cleveland to Invest in Water Main Maintenance and Corrosion Control Through 2031

Cleveland is preparing for a multi-year effort to strengthen its water infrastructure by focusing on the reliability of the pipes that deliver drinking water to the region. City Council has passed emergency ordinance 602-2026, which establishes the framework for inspecting, repairing, and replacing transmission water mains, valves, and other essential components. This program is designed to run from 2027 through 2031 and aims to address aging infrastructure by preventing failures in the city's primary water arteries.

What's in the file

The legislation authorizes the Division of Water to enter into Public Improvement and Professional Service contracts to support the Transmission Main Renewal and Corrosion Prevention and Control (CPC) program. According to the 602-2026 Legislative Summary, these efforts are necessary to mitigate corrosion, which is a primary cause of deterioration in the system's steel and iron assets.

The scope of work includes:

The total estimated cost for these combined projects is in excess of $22.6 million.

Project ItemEstimated Cost
Transmission Main Renewal Program$12,000,000.00
Phase II Cathodic Protection$2,500,000.00
Phase III Cathodic Protection$5,600,000.00
Little Met Transmission Main Liner$1,500,000.00
Corrosion Engineering Services$1,000,000.00

Who may be affected

Status and timeline

The ordinance has officially passed and is part of the city's long-term planning for water system reliability.

  1. May 7, 2026: The ordinance was introduced to City Council.
  2. 2027–2031: The planned period for the Transmission Main Renewal and Cathodic Protection program.

Residents can verify the details of this legislation by reviewing the official record for Ord. No. 602-2026.

Source record

File
602-2026
Type
Emergency Ordinance
Status
Passed
Committee
City Council
Introduced
May 6, 2026

View on Cleveland Legistar

Official documents

Sources