City to Install New Speed Tables for Traffic Calming and Pedestrian Safety
Cleveland is moving forward with a citywide plan to improve pedestrian safety and manage traffic flow through the installation and repair of various speed tables. Passed as an emergency measure under File No. 1406-2025, this ordinance allows the Director of Public Works to enter into contracts to carry out these public improvements. The project is designed to implement traffic-calming measures across the city to enhance safety for people walking in residential and high-traffic areas.
According to the 1406-2025-Legislative Summary-Speed Tables, the estimated cost for these improvements is $1,105,000 per year, with the authority to execute agreements for a period not to exceed two years. Funding for the project is drawn from several sources, including $400,000 from ARPA (C24708) and specific allocations for various wards: Ward 6 ($124,320), Ward 12 ($230,880), Ward 14 ($213,120), Ward 15 ($39,000), and Ward 16 ($97,680). The Department of Public Works, which manages city street maintenance and infrastructure, will oversee the implementation of these requirement contracts.
The ordinance has officially passed. Residents can watch for upcoming construction schedules in their specific wards as the Director of Public Works begins to finalize contracts and initiate the installation of the speed tables.
Source record
- File
- 1406-2025
- Type
- Emergency Ordinance
- Status
- Passed
- Committee
- City Council
- Introduced
- November 6, 2025
Official documents
- 1406-2025 PIK Req K speed table
- 1406-2025-Legislative Summary-Speed Tables
- 1406-2025-Speed Tables Briefing Spring 2026_Themed
- 1406-2025 Amend 1406-2025
- 1406-2025-as amended-desk copy-Final
- 1406-2025 FINAL VERSION-CITY RECORD MAY 29, 2026 PG. 47